{"id":4419,"date":"2022-02-22T20:50:40","date_gmt":"2022-02-22T20:50:40","guid":{"rendered":"https:\/\/ug6.10b.myftpupload.com\/?p=4419"},"modified":"2022-02-25T05:16:32","modified_gmt":"2022-02-25T05:16:32","slug":"8-types-of-waste","status":"publish","type":"post","link":"https:\/\/micazenconsulting.com\/8-types-of-waste\/","title":{"rendered":"8 Types of Waste"},"content":{"rendered":"\n
Waste exists in all processes. Regardless of your business, some or all of the following wastes exist in your organization. The key is to identify them and create a plan to automate and\/or eliminate as many of them as possible.<\/strong><\/p>\n\n\n\n 1. Intellect<\/strong> \u2013 failure to utilize the time and talents of people.<\/strong><\/p>\n\n\n\n 2. Motion<\/strong> \u2013 Unnecessary Travel of people. <\/strong><\/p>\n\n\n\n 3. Processing \u2013 Overproducing<\/strong>. Doing more than what is necessary.<\/strong><\/p>\n\n\n\n 4. Inventory<\/strong> \u2013 Accumulation of excess finished materials or products.<\/strong><\/p>\n\n\n\n 5. Transportation<\/strong> \u2013 Unnecessary movement of parts or paperwork.<\/strong><\/p>\n\n\n\n 6. Re-Work<\/strong> \u2013 Any defects or corrections needed to be completed.<\/strong><\/p>\n\n\n\n 7. Overproduction<\/strong> \u2013 Producing too much too soon.<\/strong><\/p>\n\n\n\n 8. Waiting \u2013 Waiting on work, information, and\/or materials<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":" Waste exists in all processes. Regardless of your business, some or all of the following wastes exist in your organization. The key is to identify them and create a plan to automate and\/or eliminate as many of them as possible. 1. Intellect \u2013 failure to utilize the time and talents of people. 2. Motion \u2013 Unnecessary Travel of people. 3. Processing \u2013 Overproducing. Doing more than what is necessary. 4. Inventory \u2013 Accumulation of excess finished materials or products. 5. Transportation \u2013 Unnecessary movement of parts or paperwork. 6. Re-Work \u2013 Any defects or corrections needed to be completed. 7. Overproduction \u2013 Producing too much too soon. <\/p>\n","protected":false},"author":1,"featured_media":4257,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","footnotes":""},"categories":[17],"tags":[],"class_list":["post-4419","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general-information","has_thumb"],"yoast_head":"\n